ABOUT US

Content Center

Total 48 items
Mounting Datums and Fastening Deformation Control for Precision Stages

Control mounting-induced deformation in precision stages with datum checks, bolt penetration and engagement calculations, staged tightening and verification records.

Cage Displacement and Travel Limit Inspection for Cross-Roller Stages

Inspect travel changes in cross-roller stages by separating control limits, rated stroke, external stops and cage retention, with a diagnostic checklist.

Linear Actuators and CNC Worktables Under Cutting Loads

Compare linear actuators and CNC worktables using cutting forces, moment arms, guide layout and compliance, with worked examples and an acceptance checklist.

Protective Cover Selection for Linear Actuators

Select linear actuator protection for dust, chips, splash and cleaning. Compare verified HZMotion cover configurations, drive resistance and maintenance checks.

Ball Screw End Machining and Assembly Fit Inspection

Inspect ball screw journals, shoulders, sleeves, threads and drive extensions with practical checks for fillet clearance, axial stacks, measurement datums and trial assembly.

Motor-Bracket Interface Checks After Servo Motor Replacement

Check motor pilots, mounting holes, shaft extensions and coupling space after a servo replacement, using a tolerance-stack example and a practical acceptance record.

Ball Screw Shaft-End Dimensions and Support Unit Matching

Match a ball screw to its support unit by checking bearing journals, shoulders, threads and coupling extensions, with verified HZMotion BK-series examples.

Accuracy Parameters and Inspection Methods for Linear Actuators and Worktables

Understand resolution, repeatability, positioning error and travel geometry, with bidirectional examples, HZMotion catalog data and an inspection template.

Disc and Jaw Coupling Selection for Linear Actuators

Compare disc and jaw couplings for linear actuators: torsional stiffness, damping, torque and alignment, with a worked example and installation checklist.

Linear Actuator Lubrication Intervals and Maintenance Planning

Plan linear actuator lubrication by component, travel and condition. Includes HZMotion manual guidance, a mileage example and a practical maintenance log.

Short-Stroke Cycle Time and Settling Time Analysis

Calculate short-stroke cycle time with a 50 mm example. Compare motion profiles, settling, process and waiting time using charts and a measurement checklist.

Corrosion Protection for Support Units, Motor Brackets and Nut Brackets

Match corrosion protection to humidity, coolant and cleaning. Includes surface-treatment checks, a coating-thickness example and an enquiry checklist.

Offset Loads and Three-Axis Moment Analysis for Linear Actuators

Calculate roll, pitch and yaw from payload position, gravity and acceleration. A 20 kg worked example compares motion stages and geometry, with catalog-rating checks.

Operating Loads and Life Assessment of Ball Screw Support Units

Assess support-unit loads and life using a revolution-weighted duty cycle. Includes a worked bearing-life example, rating definitions and engineering checks.

Radial, 30-Degree or Axial Locking? Selecting NRA, NR, NF and NK Locknuts

Compare NRA, NR, NF and NK locking access, M20×1.0 body dimensions, seating interfaces and service clearance. Includes a selection sequence and RFQ checklist.

Why Repeated Locknut Tightening Can Cause Problems: Thread, Seating and Locking Checks

Separate main-nut clamping from secondary locking. Diagnose nut movement, axial play and increased starting torque with thread, seating and acceptance checks.

Open or Closed Nut Bracket? Checking MC, MGD, MGS and NH Interfaces

Compare MC, MGD, MGS and NH nut brackets. Check six interfaces, see why MC2020 suffixes matter, and prepare complete drawings and purchasing requirements.

Increased Ball Screw Rotational Resistance After Nut Bracket Tightening: A Mounting Checklist

Find why ball screw starting torque or rotational resistance increases after nut bracket tightening. Check seating, centre height, guide alignment and interference, then record final acceptance.

Motor Bracket Shaft Misalignment: Effects and Checks for Offset, Angle and Axial Position

Separate shaft offset, angular misalignment and axial installation errors. Learn why runout is not alignment, and plan measurement, correction and final acceptance checks.

Standard vs Integrated Motor Brackets: Accuracy, Part Count, Stiffness, Cost and Serviceability

Compare standard and integrated motor brackets by locating interfaces, assembly accuracy, parts, stiffness, total cost and service needs, with replacement checks and a selection workflow.

How to Select a Servo Motor Bracket: Flange, Pilot, PCD, Shaft Extension, Centre Height and Coupling

Check servo motor flange, pilot, bolt circle, shaft extensions, centre height and coupling space. Use a HZMotion M60D/M60DP example and a worksheet to select standard or integrated motor brackets.

Fixed-End Ball Screw Support Unit Repair: Replace the Bearings or the Complete Assembly?

Diagnose external joints, alignment and temperature changes before dismantling a fixed-end support unit. Compare matched-bearing replacement with complete-unit replacement and plan the required acceptance checks.

How to Inspect a Ball Screw Support Unit After Installation: Runout, Axial Clearance, Alignment and Temperature

Turn ball-screw support-unit acceptance into a repeatable workflow: define the test state, measure runout and axial clearance, verify full-stroke alignment, stage the trial run and record the baseline.

DF, DB, DFD or DFF? Selecting a Heavy-Duty Ball Screw Fixed-End Arrangement

Compare DF, DB, DFD and DFF bearing arrangements by load direction, axial rigidity, starting torque, speed and temperature, then map the result to HZMotion WBK, SBK, FBSA and MBK heavy-duty support units.

C3, C5 or C7? Ball Screw Accuracy, Support Unit Grade, Bearing Class and Preload Explained

Learn the difference between ball-screw lead accuracy, bearing precision classes, support-unit configuration codes, preload and DF arrangements, with HZMotion selection guidance.

BK/BF, EK/EF, FK/FF or AK/AF? Choosing a Ball Screw Support Unit Family

Compare BK/BF, EK/EF, FK/FF, AK/AF and LK/LF by mounting orientation, center height, envelope and shaft-end pairing, with a five-step selection process.

How to Design an XY/XYZ Multi-Axis Platform: Abbe Error, Axis Squareness and Stacked-Axis Rigidity

Design an XY/XYZ platform around the point of interest, Abbe error, axis squareness, stacked mass and moments, interface rigidity, error budgeting and final acceptance.

Cross-Roller Stage, Heavy-Duty Work Table or Linear Actuator? A Practical Selection Guide

Compare cross-roller stages, CNC worktables and linear actuators by travel, rigidity, load, speed, accuracy, installation and integration.

How to Match Servo Inertia to a Linear Actuator: Why a Larger Motor Is Not Always Better

Reflect moving mass and screw inertia to the motor shaft, then verify speed, peak torque, RMS torque, inertia ratio, regeneration, interface and resonance.

Why Can a Vertical Axis Drop? Braking and Safety for Ball-Screw Linear Actuators

Follow the back-driving path, then separate what supports a vertical axis during motion, normal stopping, sudden power loss and maintenance.

Ball Screw or Timing Belt Linear Actuator? Start with Speed, Repeatability, Travel and Load

Compare ball screw and timing belt actuators by speed, repeatability, travel, drive thrust, guide capacity, duty and maintenance using comparable HZMotion platforms.

Linear Motion Vibration Troubleshooting: Support Unit, Locknut or Ball Screw?

Troubleshoot linear motion vibration by speed, position, direction and temperature, then isolate the support unit, locknut, ball screw, coupling, guides and base.

Ball Screw Thermal Growth: How Should the Fixed and Support Ends Be Arranged?

Understand ball screw thermal growth, compare fixed-supported and fixed-fixed arrangements, estimate expansion and distinguish thermal drift from lead error and backlash.

How Does End Support Affect Ball Screw Critical Speed? From Fixed-Supported to Fixed-Fixed

Understand ball screw critical speed and whip, compare fixed-free, supported-supported, fixed-supported and fixed-fixed mounting, and use the formula, worked example and HZMotion support-unit mapping for preliminary selection.

Fixed End, Support End or Heavy-Duty Fixed End? Ball Screw Support Unit Selection Guide

Compare standard fixed-end, support-end and heavy-duty fixed-end ball screw support units by function, bearing arrangement, mounting interface, load and accuracy, with HZMotion series pairings and selection steps.

Precautions for Bearing Housing Installation and Use

Support units are pre-filled with grease; no additional lubrication is required before use. Keep the support units clean during installation and operation. Prevent dust and debris

Support Unit Selection Guide and Recommended Selection Procedure

Fully understand the load capacity, rigidity requirements, and end dimensions of the ball screw, trapezoidal screw, or ball spline, as well as the assembly characteristics of the e

Precautions for Motor Brackets Installation and Use

◼ The bearings in C-type and KK-type motor brackets are pre-filled with grease; no additional lubrication is needed before use. ◼ Keep the motor bracket clean during installation a

Motor Bracket Selection Guide and Recommended Selection Steps

Fully understand the load capacity, rigidity requirements, end dimensions, and overall assembly characteristics of the ball screw, trapezoidal screw, or ball spline, as well as the

Support Unit Troubleshooting

序号: 问题现象: 问题排查: 1 Support Unit Surface Rust Surface treatments only provide a limited duration of protection. During use, the surface should be continuously maintained with an oil

Motor Bracket Troubleshooting

No: Observed Issue: Troubleshooting: 1 Motor Bracket Surface Rust Surface treatments only provide a certain period of protection. During use, the surface should be continuously mai

Support Unit Installation Steps

Check each step during support unit installation to help ensure system performance and service life.

Website Update Announcement

Dear Valued Customers, To provide both our new and existing customers with a better browsing experience, we have updated our HZMotion website. Our product displays are now clearer, with a more complete range of models fo

Mr. Ma Fengju, chairman of the company, was awarded the title of Taishan Industry Leading Talent

Mr. Ma Fengju, chairman of our company, won the title of Taishan industry leading talent, Shandong Province recently selected 175 Taishan industry leading talents, this batch of selected people is the province's ecologic

HZMotion officially launched overseas business

HZMotion officially launched overseas business to serve advanced and better enterprises all over the world.

Our company has obtained three more patent certifications

HZMotion has never stopped its pace in research and development, and has obtained three patent certifications. "Rolling linear guide pair and ball integrated reverse holding device", certificate number 7166093; "Preload

HZMotion motor seat products are newly launched

In August 2024, a new product of C-type motor seat will be launched. The specific models are as follows: M100Y-SBK25D-C 、 M100YP-SBK25D-C 、 M116S-SBK25D-C 、 M130G-SBK25D-C 、 M100Y-SBK30D-C 、 M100YP-SBK30D-C 、 M116S-SBK30

HZMotion participated in the 19th China International Machine Tool Exhibition in Beijing on April 21st

我司参加北京市机床展览